Put the piece of cardboard over the hole drill and draw a contour of the cardboard on the soffit.
Finishing garage roof soffet.
From what we ve noticed and our personal experience most builders do not finish garages.
Make sure your ventilation is effective by installing vent chutes between the trusses.
Soffit is the hard aluminum wood or vinyl material that covers the underside of a roof s overhangs and provides a finished look.
For a typical 20 x 22 ft.
Most soffit comes in long 12 inch wide strips and you must cut it into pieces to fit the dimensions of your sub fascia.
1 4 lumber and 1 1 4 finishing nails trims.
A good rule of thumb is a total of 1 sq.
Take your ladder and get to the outside of the house placing it under the intended side of the vent.
Be careful not to damage any nearby roof shingles or flashing.
Remove sections of siding immediately adjacent to the top edge of the roof.
If the siding is vinyl use a siding removal tool to pop out the bottom edge.
Soffit vents and two standard square roof vents.
2 pieces of 3 3 windows 1 door 1 garage door doors and windows.
Garage you d need about six 4 in.
Pry the narrow shingle mold from the fascia using a flat bar.
Soffit and fascia repair 1.
They usually just finish the one or two firewalls because it is required by code.
Other than cost cutting the reason may be because as far as i can tell this is not an issue for most people.
Now all you have to do is cut out the outline with a saw and insert the soffit by fixing it with a nail.
Pull down to remove the old soffit.
Smartside 23 938 in x 191 875 in 38 series primed wood vented soffit.
Vent chutes have a channel that prevents blown insulation from blocking the airflow from the soffit vents to the attic space.
Of attic divided between the soffit and roof vents.
Soffit add the finishing touch under the eaves.
In order to build a garage roof you need to use the following.
In of vent opening per 300 sq.
If it comes off without splitting reuse it later.
Finish the shingles up to the top edge of the lean to as described in steps 1 5 above.
This includes building ou.
Remove the rotted section of fascia.
Chalk line tape measure spirit level carpentry pencil.